Consent Compliance
Under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981, “any construction project or industry, operation or process or an extension and addition thereto, which is likely to discharge sewerage or trade effluent into the environment or likely to emit any air pollution into the atmosphere will have to obtain the Consent” from Pollution Control Board (PCB)
In Maharashtra Pollution Control Board (MPCB) regulates consents in state of Maharashtra
There are two types of the Consent i.e. Consent to Establish (CTE), and Consent to Operate (CTO).
PROCEDURE TO OBTAIN CONSENT
All the industrial sectors/projects have been categorized under Red, Orange, Green and White categories based upon their pollution potential and range of pollution index for the purpose of consent management under Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981.
The process for obtaining consent to establish and to operate involves making an application to the respective State Pollution Control Board along with required documents and scrutiny fees using the online portal of the State pollution control Board (Online consent management).
It’s followed by physical scrutiny of the location and assessment of the environmental management system planned to meet with the mandatory requirement prescribed by the State Pollution Control Board.
Consent to Operate: Once the Construction Project, Industry, Plant, or Process being established according to mandatory pollution control systems, the units are required to obtain consent to operate.
Minimum Order Quantity | 1 project |
Consultancy Service Type | Consultancy |
Type | MPCB |
Coverage Area | > 1000 square feet |
Testing Location | Mumbai |
Application Area Located At | Urban Area |
Mode Of Report | Online |
Need AMC | yes |
Site Visit Timing | 10: 00 am to 6:00 pm |
Type Of Pollution | Air, Water |
Door Material | Not applicable |
Consent Compliance
Under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981, “any construction project or industry, operation or process or an extension and addition thereto, which is likely to discharge sewerage or trade effluent into the environment or likely to emit any air pollution into the atmosphere will have to obtain the Consent” from Pollution Control Board (PCB)
In Maharashtra Pollution Control Board (MPCB) regulates consents in state of Maharashtra
There are two types of the Consent i.e. Consent to Establish (CTE), and Consent to Operate (CTO).
PROCEDURE TO OBTAIN CONSENT
All the industrial sectors/projects have been categorized under Red, Orange, Green and White categories based upon their pollution potential and range of pollution index for the purpose of consent management under Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981.
The process for obtaining consent to establish and to operate involves making an application to the respective State Pollution Control Board along with required documents and scrutiny fees using the online portal of the State pollution control Board (Online consent management).
It’s followed by physical scrutiny of the location and assessment of the environmental management system planned to meet with the mandatory requirement prescribed by the State Pollution Control Board.
Consent to Establish: This consent is required to be obtained before establishing any Construction Project, Industry, Plant, or Process. The Consent to Establish is the primary clearance.