repeat">
Eco Support Private Limited
Eco Support Private Limited
Near Passport office., Thane, Maharashtra
GST No. 27AADCE8417B1ZW
08047642698 90% Response Rate
Send E-mail

Environmental Consultancy Services

Providing you the best range of consent to operate, consent to establish and pollution control consultancy with effective & timely delivery.
Request CallBack
Consent to Operate
Get Best Quote

Consent to Operate

Approx. Price: Rs 75,000 / projectGet Latest Price
Product Details:
Coverage Area> 1000 square feet
TypeMPCB
Consultancy Service TypeConsultancy
Type Of PollutionAir, Water
Site Visit Timing10: 00 am to 6:00 pm
Need AMCyes
Mode Of ReportOnline
Application Area Located AtUrban Area

Consent Compliance

Under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981, “any construction project or industry, operation or process or an extension and addition thereto, which is likely to discharge sewerage or trade effluent into the environment or likely to emit any air pollution into the atmosphere will have to obtain the Consent” from Pollution Control  Board (PCB)

In Maharashtra Pollution Control Board (MPCB) regulates consents in state of Maharashtra

There are two types of the Consent i.e. Consent to Establish (CTE), and Consent to Operate (CTO).

PROCEDURE TO OBTAIN CONSENT

All the industrial sectors/projects have been categorized under Red, Orange, Green and White categories based upon their pollution potential and range of pollution index for the purpose of consent management under Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981.

The process for obtaining consent to establish and to operate involves making an application to the respective State Pollution Control Board along with required documents and scrutiny fees using the online portal of the State pollution control Board (Online consent management).

 

It’s followed by physical scrutiny of the location and assessment of the environmental management system planned to meet with the mandatory requirement prescribed by the State Pollution Control Board.

Consent to Operate: Once the Construction Project, Industry, Plant, or Process being established according to mandatory pollution control systems, the units are required to obtain consent to operate.

 


Yes! I am interested
Request CallBack
Consent to Establish
Get Best Quote

Consent to Establish

Approx. Price: Rs 75,000 / projectGet Latest Price
Product Details:
Minimum Order Quantity1 project
Consultancy Service TypeConsultancy
TypeMPCB
Coverage Area> 1000 square feet
Testing LocationMumbai
Application Area Located AtUrban Area
Mode Of ReportOnline
Need AMCyes
Site Visit Timing10: 00 am to 6:00 pm
Type Of PollutionAir, Water
Door MaterialNot applicable

Consent Compliance

Under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981, “any construction project or industry, operation or process or an extension and addition thereto, which is likely to discharge sewerage or trade effluent into the environment or likely to emit any air pollution into the atmosphere will have to obtain the Consent” from Pollution Control  Board (PCB)

In Maharashtra Pollution Control Board (MPCB) regulates consents in state of Maharashtra

There are two types of the Consent i.e. Consent to Establish (CTE), and Consent to Operate (CTO).

PROCEDURE TO OBTAIN CONSENT

All the industrial sectors/projects have been categorized under Red, Orange, Green and White categories based upon their pollution potential and range of pollution index for the purpose of consent management under Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981.

The process for obtaining consent to establish and to operate involves making an application to the respective State Pollution Control Board along with required documents and scrutiny fees using the online portal of the State pollution control Board (Online consent management).

 

It’s followed by physical scrutiny of the location and assessment of the environmental management system planned to meet with the mandatory requirement prescribed by the State Pollution Control Board.

Consent to Establish: This consent is required to be obtained before establishing any Construction Project, Industry, Plant, or Process. The Consent to Establish is the primary clearance.

 


Yes! I am interested
Request CallBack
  • Pollution Control Consultancy
  • Pollution Control Consultancy
  • Pollution Control Consultancy
Pollution Control Consultancy
Ask For Price

Pollution Control Consultancy

Product Price : Get Latest Price
Product Details:
Service LocationPan India
PaymentOnline
UsagePollution Control
ModeOffline/ Online
typeConsultancy
 Available with us is a quality-proved gamut of Pollution Control Consultancy for our valueable clients.

Yes! I am interested
X